NAME OF PROJECT:  REED HENDERSON HIGH SCHOOL, Chiller Plant Upgrade

PROJECT LOCATION:  West Chester, Pennsylvania

PROJECT OVERVIEW:

The project included providing and installing a modular chiller, air cooled condensing unit, piping, valves, and insulation on the roof and in the boiler room at Henderson High School.

This single prime contract included Plumbing, Electrical, and HVAC components including  all materials, labor, supervision, field design, installation, setup, controls, commissioning, licensing and training.

PROJECT OWNER:  West Chester Area School District

ARCHITECT / ENGINEER:  Moore Engineering

PROJECT COMPLETED:  11/15/2015