POOL FILTER REPLACEMENT – Hollinger Field House

POOL FILTER REPLACEMENT – Hollinger Field House

NAME OF PROJECT:  Pool Filter Replacement at Hollinger Field House

PROJECT LOCATION: 150 University Avenue, West Chester, PA  19383

PROJECT OVERVIEW:

Hollinger Fieldhouse is the University’s major basketball facility. It is also the primary North Campus indoor recreation facility for the University.  It is heavily used day and night.

Work included demolishing of existing filter unit, piping/valves, pump, strainer and air compressor, flowmeter, housekeeping pad under existing pump and air compressor. Existing water fount was removed; doorway opening was enlarged, new door and frame was added.

Furnished and installed the filter, pump, VFD and strainer, valves and gears, PVC piping, hangers/supports, flowmeter, flow indicator. The existing chemical pump and storage tank were relocated.

 PROJECT OWNER: West Chester University

ARCHITECT / ENGINEER: Wallover Architects, Inc.

PROJECT COMPLETED:  11/1/2015