NAME OF PROJECT: NORTH CAMPUS District ‐ Geothermal Phase 2 Distribution Piping

PROJECT LOCATION: West Chester, Pennsylvania

DESCRIPTION OF PROJECT

This project for West Chester University included the complete installation of main distribution HDPE double‐piped trenching with steel piping routed through existing steam tunnel and capped for future extensions in dormitory halls. The site work included excavation, bedding and installation of new geothermal piping, backfill and restoration of the final surface back to its original condition.

PROJECT OWNER: WEST CHESTER UNIVERSITY

ARCHITECT/ENGINEER: Engineer: Century Engineering